Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.1793397
- Product Categories
- Friendly Links
Information Name: | Polypropylene fiber anticorrosive tape |
Published: | 2012-03-15 |
Validity: | 500 |
Specifications: | Polypropylene fiber anticorrosive tape |
Quantity: | 0.00 |
Price Description: | Inquire |
Detailed Product Description: | Polypropylene fiber anticorrosive tape one, use features: Polypropylene fiber anticorrosive tape is a new type of pollution, no hazard to environment-friendly anti-corrosion products, representing the current international and domestic cold tape wrapped around the highest level of antisepsis, the "preservation of the crown" reputation. Can be widely used in petroleum, natural gas, chemicals, urban construction, water supply and drainage, gas, gas transmission pipelines and steel underground steel storage tank outside the preservation and restoration projects. The State Ministry of Construction, State Environmental Protection Administration to specify an alternate "asphalt glass fiber cloth," "coal tar epoxy," the recommended products. With the construction of simple, impact resistance, aging resistance, stretching, resistance to ultraviolet radiation, high bond strength characteristics. The product material is a unique woven polypropylene fabric, the use of butyl rubber modified bitumen anticorrosion layer. The substrate is a fibrous structure can effectively resist the stresses generated due to soil creep damage, the aging test proved that the corrosion life of more than 50 years, the detection index is much higher than SY/T0414-98 standards, fully to the United States ANSI/AWWAC209-00 and NACEMR0274-95 index. Construction of pipeline corrosion tape in the cold the best choice, but also the most economical choice corrosion. Three items to use: (1) and the surface treatment: rust, in addition to welding slag, burrs, oil, dirt and keep clean and dry. St3 level should be reached by hand rust, rust should reach Sa2 mechanical level, and meet the requirements SYJ4 0 0 7-8 6. (2), primer: primer should be dedicated support, when used away from the fire, mix well and with a clean brush, roller or other mechanical method of uniform coating. Primer amount: manual coating 12 ㎡ / L machine coating of 20 m / L (3), until primer is dry (usually 5 to 10 minutes) can be wrapped around the belt. (4), under the backfill: acceptance by the quality inspection to the next ditch. Fourth, during the transportation: (1), adhesive tape anti-exposure during transport, anti-rain, to prevent crush deformation. (2), in the transport or storage in the cold by the storm below 5 ℃, the need to store about 20 ℃ for 48 hours before construction. (3), should be negative 凉, temperature 5 ~ 30 ℃, temperature <75 ℃ warehouse storage, storage period of 12 months, and away from heat and flame. |
Admin>>>
You are the 22227 visitor
Copyright © GuangDong ICP No. 10089450, Schindler Technology Development Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 22227 visitor
Copyright © GuangDong ICP No. 10089450, Schindler Technology Development Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility